What the examiner wants

Explain run-of-river hydro projects and how they differ from storage projects.

What; How differentAnswer exactly what the question asks.

Demand-wise check

  1. 1Concept: uses natural river flow with little or no reservoir; small pondage for daily peaks; often diverts water through a tunnel to a powerhouse≈20 words
  2. 2Differences: small submergence and displacement, lower cost and quicker build, but output varies with season and no flood control or irrigation≈20 words
  3. 3Concerns: dry stretches downstream, cumulative impact of cascades in Himalayas, sediment≈20 words

Open in about 20 words and close in about 20.

Answer plan

DefinitionHow it worksComparison with storage damsConcerns

Where marks usually go

  • Saying run-of-river has zero environmental impact
  • No contrast table

Draw this

  • Side-by-side sketch: storage dam with reservoir vs diversion weir with tunnel and powerhouse

Value addition

  • ExampleNathpa Jhakri (1,500 MW) on the Satluj is a run-of-river project.SJVN
  • TreatyIndus Waters Treaty (1960) lets India build run-of-river projects on western rivers with limited pondage.Indus Waters Treaty, Annexure D