QUESTION 6
GS2
10 marks
The Gati-Shakti Yojana needs meticulous coordination between the government and the private sector to achieve the goal of connectivity. Discuss.
WRITE IN
7 min
150 words
What the examiner wants
Discuss why PM Gati Shakti needs close government–private coordination to deliver integrated connectivity.
DiscussExplain the different sides of the issue, use evidence, and finish with a balanced view.
Demand-wise check
- 1What Gati Shakti is: National Master Plan (2021), GIS platform linking ministries and states, seven engines≈35 words
- 2Why coordination is needed: private capital, logistics firms, last-mile links, data sharing, PPP≈35 words
- 3Challenges and measures: land, approvals, data gaps, state participation≈35 words
Open in about 20 words and close in about 20.
Answer plan
SchemeCoordination needsChallengesMeasuresConclusion
Where marks usually go
- Describing the scheme without the government–private sector angle
- Not naming the seven engines or the National Logistics Policy
Draw this
- Hub diagram: Gati Shakti platform connecting ministries, states and private players
Value addition
- FactPM Gati Shakti's seven engines: railways, roads, ports, waterways, airports, mass transport, logistics infrastructure.DPIIT, Ministry of Commerce
- PolicyNational Logistics Policy (2022) aims to bring logistics cost down to global benchmarks.DPIIT
Mapped topper copies
Reviewed public-source references related to this PYQ. Same-syllabus references are labelled separately.
- Shakti Dubey · AIR 1 · Page 38 ↗Same syllabus reference
- Aditya Srivastava · AIR 1 · Page 15 ↗Same syllabus reference
- Shakti Dubey · AIR 1 · Page 15 ↗Same syllabus reference
- Aditya Srivastava · AIR 1 · Page 5 ↗Same syllabus reference
Links open original public sources. MainsBuddy does not host these answer sheets.
Next: plan for one minute, write it in 7 minutes, then get it checked.