MAINS 2016
GS1
12.5 marks
Enumerate the problems and prospects of inland water transport in India.
WRITE IN
9 min
200 words
What the examiner wants
List the problems and the future prospects of inland water transport in India.
EnumerateList the points, each with a one-line explanation.
Demand-wise check
- 1Problems: seasonal flows and low draft, siltation, poor terminals and night navigation, lack of last-mile connectivity, low private investment, competition from rail/road≈45 words
- 2Prospects: cheapest and greenest mode, cargo like coal and fertiliser, Jal Marg Vikas, Sagarmala, Indo-Bangladesh protocol routes, river cruises≈45 words
- 3Way forward: dredging, multimodal terminals, ro-ro, PPP≈45 words
Open in about 30 words and close in about 30.
Answer plan
StatusProblemsProspects with projectsWay forward
Where marks usually go
- Writing about coastal shipping or ports instead of inland waterways
- No waterway names
Draw this
- Map of NW-1 (Ganga), NW-2 (Brahmaputra), NW-3 (West Coast Canal)
Value addition
- LawNational Waterways Act 2016 declared 106 new national waterways, taking the total to 111.National Waterways Act, 2016
- ProjectJal Marg Vikas Project on NW-1 (Haldia-Varanasi) with World Bank support; multimodal terminal at Varanasi opened in 2018.IWAI
Next: plan for one minute, write it in 9 minutes, then get it checked.