QUESTION 7
GS3
10 marks
Discuss how the contradiction between ‘rapid infrastructure development’ and ‘disaster-risk reduction’ in ecologically-sensitive areas of India can be managed, with suitable examples.
WRITE IN
7 min
150 words
What the examiner wants
Show how roads, tunnels and dams in the Himalaya, Western Ghats and coasts raise disaster risk, and how risk-informed planning, design and oversight can reconcile them.
DiscussExplain the different sides of the issue, use evidence, and finish with a balanced view. More on “discuss”
Demand-wise check
- 1Explain amplification: slope cutting and blasting, tunnelling in weak rock, riverbed encroachment, coastal reclamation and forest loss≈30 words
- 2Use failure cases: Joshimath subsidence (2023), Silkyara tunnel collapse (Nov 2023), Wayanad landslides (July 2024)≈30 words
- 3Planning safeguards: carrying-capacity studies, cumulative EIA, hazard zonation and enforcement of eco-sensitive zones≈30 words
- 4Design and governance: slope stabilisation, tunnel escape routes, court-appointed oversight and CDRI resilient-infrastructure principles≈30 words
Open in about 20 words and close in about 20.
Answer plan
Why the contradiction arisesFailure cases (Joshimath, Silkyara, Wayanad)Planning safeguardsDesign safeguardsMonitoring and governanceBalanced conclusion
Where marks usually go
- Calling for a halt to all Himalayan infrastructure, ignoring defence and livelihood needs
- Citing disasters without showing how construction amplified the hazard
Draw this
- Himalayan slope sketch: road cut, tunnel and hydro dam with hazard callouts and matching safeguards
Value addition
- CaseIn December 2021 the Supreme Court allowed Char Dham roads to be widened to 10 m for defence needs but set up an oversight committee under Justice A.K. Sikri to monitor environmental safeguards.Supreme Court — Ministry of Defence v. Citizens for Green Doon, 2021
- ReportThe Gadgil panel (2011) proposed protecting most of the Western Ghats; Kasturirangan (2013) cut the eco-sensitive area to about 37%, and MoEFCC's sixth draft notification (July 2024) proposed 56,825 sq km.WGEEP 2011; HLWG 2013; MoEFCC draft notification, 2024
- CaseThe Silkyara tunnel collapse in Uttarakhand (November 2023) trapped 41 workers for 17 days, exposing the lack of an escape passage and of geological checks in fragile rock.MoRTH / NHIDCL, 2023
Topper copies
- Mayank Purohit · AIR 33 · Page 5 ↗Same question
- Shakti Dubey · AIR 1 · Page 44 ↗Same syllabus topic
- Aniket Ranjan · AIR 48 · Page 44 ↗Same syllabus topic
- Aniket Ranjan · AIR 48 · Page 17 ↗Same syllabus topic
Links open original public sources. MainsBuddy does not host these answer sheets.