← All questionsGS3 · 2026 · Disaster Management ·Infrastructure vs Disaster Risk
QUESTION 7
GS3
10 marks

Discuss how the contradiction between ‘rapid infrastructure development’ and ‘disaster-risk reduction’ in ecologically-sensitive areas of India can be managed, with suitable examples.

WRITE IN
7 min
150 words

Join daily PYQ on Telegram ↗

What the examiner wants

Show how roads, tunnels and dams in the Himalaya, Western Ghats and coasts raise disaster risk, and how risk-informed planning, design and oversight can reconcile them.

DiscussExplain the different sides of the issue, use evidence, and finish with a balanced view. More on “discuss”

Demand-wise check

  1. 1Explain amplification: slope cutting and blasting, tunnelling in weak rock, riverbed encroachment, coastal reclamation and forest loss≈30 words
  2. 2Use failure cases: Joshimath subsidence (2023), Silkyara tunnel collapse (Nov 2023), Wayanad landslides (July 2024)≈30 words
  3. 3Planning safeguards: carrying-capacity studies, cumulative EIA, hazard zonation and enforcement of eco-sensitive zones≈30 words
  4. 4Design and governance: slope stabilisation, tunnel escape routes, court-appointed oversight and CDRI resilient-infrastructure principles≈30 words

Open in about 20 words and close in about 20.

Answer plan

Why the contradiction arisesFailure cases (Joshimath, Silkyara, Wayanad)Planning safeguardsDesign safeguardsMonitoring and governanceBalanced conclusion

Where marks usually go

  • Calling for a halt to all Himalayan infrastructure, ignoring defence and livelihood needs
  • Citing disasters without showing how construction amplified the hazard

Draw this

  • Himalayan slope sketch: road cut, tunnel and hydro dam with hazard callouts and matching safeguards

Value addition

  • CaseIn December 2021 the Supreme Court allowed Char Dham roads to be widened to 10 m for defence needs but set up an oversight committee under Justice A.K. Sikri to monitor environmental safeguards.Supreme Court — Ministry of Defence v. Citizens for Green Doon, 2021
  • ReportThe Gadgil panel (2011) proposed protecting most of the Western Ghats; Kasturirangan (2013) cut the eco-sensitive area to about 37%, and MoEFCC's sixth draft notification (July 2024) proposed 56,825 sq km.WGEEP 2011; HLWG 2013; MoEFCC draft notification, 2024
  • CaseThe Silkyara tunnel collapse in Uttarakhand (November 2023) trapped 41 workers for 17 days, exposing the lack of an escape passage and of geological checks in fragile rock.MoRTH / NHIDCL, 2023

Topper copies

Links open original public sources. MainsBuddy does not host these answer sheets.